Power Platform

Release plans for Power Platform stop in September 2026

Microsoft stops publishing Power Platform and Dataverse release plans this month and retires Release Planner on 2026-11-15, so move your tracking now.

ProApps Labs4 min read

What changed

If you open any Power Platform release plan on Microsoft Learn this week, you'll see a banner at the top: release plans will no longer be published starting in September 2026. That's the whole story in one line, and it applies to Power Apps, Power Automate, Power Pages, Dataverse and the governance plans alike.

Microsoft announced it on 25 August in One always-on roadmap: Dynamics 365, Power Platform, and Dataverse join the AI at Work roadmap. The twice-yearly release wave 1 and release wave 2 model is retired. There is no 2026 release wave 2 plan for Power Platform, and the FAQ on that post answers the obvious question with a single word: no. New capabilities get published to the AI at Work roadmap as soon as they're committed, then tracked there through In Development, Rolling Out and Launched.

The same change covers Dynamics 365, including Business Central, but the mechanics below are about the Power Platform side.

The dates that matter

Three of them.

September 2026: new Power Platform and Dataverse capabilities start publishing to the AI at Work roadmap instead of Learn. The 2026 release wave 1 plans, which cover April through September, stay where they are.

September to November 2026: existing roadmap items with a public preview or general availability date of 1 June 2026 or later migrate over. Anything earlier stays on Learn for historical reference. Microsoft says the transition notices will come through Message Center, so whoever reads Message Center for your tenants is now also the person who finds out when a given plan moved.

By 15 November 2026: the transition completes and Release Planner retires. That's the interactive site at aka.ms/PowerPlatformReleasePlanner that a lot of consultants have used as their working view of the roadmap. It goes away.

What you actually lose

Saved views. The FAQ is explicit that personalised saved views in My Release Plans won't carry over, and the AI at Work roadmap doesn't have an equivalent. If you've built a view per client — Power Automate plus Dataverse, filtered to what they've licensed — that view is gone on 15 November. Export it before then. The Release Planner has always allowed an export, and the new roadmap supports CSV export of a filtered view, so the practical fix is a saved CSV per client plus a bookmarked filter on the new site. Not elegant, but it works.

The other loss is quieter: the fixed moment. Release wave 1 in April and release wave 2 in October gave partners a natural cadence for the "what's coming, what do we need to do" conversation with a client. Microsoft's own advice is to replace that with a recurring review, monthly or quarterly, built on a saved filter and an RSS subscription. I'd go monthly for any client with active Power Automate flows against Business Central, because a connector change tends to arrive with less warning than an app feature does.

What doesn't change

This is a change to disclosure, not to shipping. The Power Platform admin documentation on opting in to early access updates still describes two major releases a year, in April and October, and the blog post says products with established schedules keep them. Message Center stays the source for tenant-specific change notifications. Microsoft Learn stays the documentation home; it just stops being where the roadmap lives.

So your update calendar for environments doesn't move. Where you read about the updates does.

Querying the roadmap instead of browsing it

The piece worth trying is the Microsoft Release Communications MCP Server. It's a remote MCP server, no authentication, no licence, that exposes the data behind the AI at Work roadmap and Azure Updates to any MCP-compatible client. The endpoint is a single URL, and the standard configuration is short:

{
  "servers": {
    "MRC-MCP-Server": {
      "type": "http",
      "url": "https://www.microsoft.com/releasecommunications/mcp"
    }
  }
}

It exposes four tools: get_recent_roadmaps and get_roadmap_by_id for the roadmap, get_recent_azure_updates and get_azure_update_by_id for Azure. The roadmap tools take OData filters on products, platforms, release rings, cloud instances, status and dates, and return up to 50 items per call with truncated descriptions. The data refreshes daily.

For a consultant, the useful pattern is a monthly prompt along the lines of "which Power Automate and Dataverse items changed status since last month", pasted into whatever client you already use, with the result dropped into the client's review notes. That's a five-minute job and it replaces most of what the saved view in Release Planner was doing. One caution from the docs themselves: the tools return truncated descriptions to fit AI context windows, so read the roadmap entry before you tell a client a feature does something.

What to do this month

Export your saved views from Release Planner while it still exists. Open the AI at Work roadmap, set a filter for the Power Platform products your clients run, and subscribe to the RSS feed for that filter. Update any internal documentation, onboarding notes or client decks that link to the Learn release plans, since new content won't appear there. Then pick a review cadence and put it in the calendar.

None of this is urgent in the way a deprecation is. Nothing breaks on 15 November. But the people who track this for a living have a habit, and the habit now points at a site that's about to go dark.

Get the ProApps Labs newsletter

Business Central, Power Platform and Azure notes from ProApps Labs, by email. Double opt-in; unsubscribe any time.

We respect your privacy. Unsubscribe at any time.

Power Platform

Power Automate or an AL Extension?

Power Automate is the right choice when the logic is really about coordinating people and services around a Business Central record, not about the record itself. Approvals are the clearest case…

2 min read

Back to blog